Subscribe to get full technical access to each of the projects with details on how existing conditions were challenged and Optimal conditions identified to reduce Cost and Cycle time

Number of Projects
count
Total Savings in
Rs. Lakhs
count

Cycle Time Reduction
Injection Moulding
Number of Responses
1
Number of Design Parameters
3
Number of Significant Design Parameters
1
Baseline
Cycle time: 55 seconds/shot
Result Achieved
Cycle time: 48 seconds/shot

Cycle Time Reduction
Injection Moulding
Number of Responses
5
Number of Design Parameters
6
Number of Significant Design Parameters
4
Baseline
Cycle time per shot: 16 seconds
Result Achieved
Cycle time per shot: 13 seconds

Material Cost Reduction
Turning
Number of Responses
2
Number of Design Parameters
1
Number of Significant Design Parameters
1
Baseline
Coolant concentration: 5%
Result Achieved
Coolant consumption reduction by 30%

Cycle Time Reduction
Profile Turning
Number of Responses
3
Number of Design Parameters
3
Number of Significant Design Parameters
1
Baseline
Cycle time: 76 seconds per piece
Result Achieved
Cycle time: 65 seconds per piece

Cycle Time Reduction
Shot Peening
Number of Responses
2
Number of Design Parameters
2
Number of Significant Design Parameters
1
Baseline
Production per day: 2,430 pieces
Result Achieved
Production per day: 3,500 pieces

Cycle Time Reduction
Burnishing
Number of Responses
1
Number of Design Parameters
2
Number of Significant Design Parameters
2
Baseline
Cycle time per component: 28 seconds
Result Achieved
Cycle time per component: 15 seconds

Wheel Cost Reduction
Grinding
Number of Responses
3
Number of Design Parameters
3
Number of Significant Design Parameters
2
Baseline
Wheel life: 16,500 Pieces/Wheel
Result Achieved
Wheel life: 27,700 Pieces/Wheel

Cycle Time Reduction
Milling
Number of Responses
2
Number of Design Parameters
5
Number of Significant Design Parameters
1
Baseline
Pieces per month: 234
Result Achieved
Pieces per month: 238

Cycle Time Reduction
Grinding
Number of Responses
4
Number of Design Parameters
2
Number of Significant Design Parameters
1
Baseline
Cycle Time : 176 Seconds per stack
Result Achieved
Cycle Time: 133 Seconds per Stack

Cycle Time Reduction
Grinding
Number of Responses
3
Number of Design Parameters
1
Number of Significant Design Parameters
1
Baseline
Cycle Time : 16 seconds/piece
Result Achieved
Cycle Time : 12 Seconds/piece