Subscribe to get full technical access to each of the projects with details on how existing conditions were challenged and Optimal conditions identified to reduce Cost and Cycle time

Number of Projects
count
Total Savings in
Rs. Lakhs
count

Material Cost Reduction
Core Sand Making
Number of Responses
1
Number of Design Parameters
4
Number of Significant Design Parameters
2
Baseline
Resin and Hardener Quantity : 2 Kgs for each batch
Result Achieved
Resin and Hardener Quantity : 1.6 Kgs for each batch

Material Cost Reduction
Metal Treatment
Number of Responses
1
Number of Design Parameters
1
Number of Significant Design Parameters
1
Baseline
Quantity of Magnesium per day: 1000 Kgs
Result Achieved
Quantity of Magnesium consumed: 970 Kgs

Material Cost Reduction
Power Coating
Number of Responses
1
Number of Design Parameters
3
Number of Significant Design Parameters
1
Baseline
Powder Consumption : 110 grams / Component
Result Achieved
Powder Consumption : 90 grams / Component

Cycle Time Reduction
Cast On Strap Casting
Number of Responses
1
Number of Design Parameters
2
Number of Significant Design Parameters
1
Baseline
Batteries per day: 1344/day
Result Achieved
Batteries per day: 1438/day

Cycle Time Reduction
Substrate Drying
Number of Responses
1
Number of Design Parameters
1
Number of Significant Design Parameters
1
Baseline
Production: 2,800 pieces/shift
Result Achieved
Production: 3,000 pieces/shift

Energy Consumption Reduction
Washing
Number of Responses
2
Number of Design Parameters
1
Number of Significant Design Parameters
1
Baseline
Energy Consumption: 110 KWH/Shift
Result Achieved
Energy Consumption: 70 KWH/Shift

Energy Consumption Reduction
Seat Foam Manufacturing
Number of Responses
1
Number of Design Parameters
1
Number of Significant Design Parameters
1
Baseline
Energy: 4075 KWH/day
Result Achieved
Energy: 3887 KWH/day

Gas Consumption Reduction
Drying
Number of Responses
2
Number of Design Parameters
2
Number of Significant Design Parameters
1
Baseline
Gas specific consumption: 3.5 Sm3/Metric Ton
Result Achieved
Gas specific consumption: 2.8 Sm3/Metric Ton

Energy Consumption Reduction
Ultrasonic Cleaning
Number of Responses
1
Number of Design Parameters
1
Number of Significant Design Parameters
1
Baseline
Energy Consumption: 23.32 KWH/Hour
Result Achieved
Energy Consumption: 18.72 KWH/Hour

Material Cost Reduction
Plasma Powder Welding
Number of Responses
2
Number of Design Parameters
1
Number of Significant Design Parameters
1
Baseline
Powder Weight: 2.1 grams/component
Result Achieved
Powder Weight: 1.5 grams/component