Subscribe to get full technical access to each of the projects with details on how existing conditions were challenged and Optimal conditions identified to reduce Cost and Cycle time

Atom-1s-200px (2).gif

Number of Projects 

count

Total Savings in

Rs. Lakhs

count

Material Cost Reduction

Core Sand Making

Number of Responses

1

Number of Design Parameters 

4

Number of Significant Design Parameters

2

Baseline

Resin and Hardener Quantity : 2 Kgs for each batch

Result Achieved

Resin and Hardener Quantity : 1.6 Kgs for each batch

Material Cost Reduction

Metal Treatment

Number of Responses

1

Number of Design Parameters 

1

Number of Significant Design Parameters

1

Baseline

Quantity of Magnesium per day: 1000 Kgs

Result Achieved

Quantity of Magnesium consumed: 970 Kgs

Material Cost Reduction

Power Coating

Number of Responses

1

Number of Design Parameters 

3

Number of Significant Design Parameters

1

Baseline

Powder Consumption : 110 grams / Component

Result Achieved

Powder Consumption : 90 grams / Component

Cycle Time Reduction

Cast On Strap Casting

Number of Responses

1

Number of Design Parameters 

2

Number of Significant Design Parameters

1

Baseline

Batteries per day: 1344/day

Result Achieved

Batteries per day: 1438/day

Cycle Time Reduction

Substrate Drying

Number of Responses

1

Number of Design Parameters 

1

Number of Significant Design Parameters

1

Baseline

Production: 2,800 pieces/shift

Result Achieved

Production: 3,000 pieces/shift

Energy Consumption Reduction

Washing

Number of Responses

2

Number of Design Parameters 

1

Number of Significant Design Parameters

1

Baseline

Energy Consumption: 110 KWH/Shift

Result Achieved

Energy Consumption: 70 KWH/Shift

Energy Consumption Reduction

Seat Foam Manufacturing

Number of Responses

1

Number of Design Parameters 

1

Number of Significant Design Parameters

1

Baseline

Energy: 4075 KWH/day

Result Achieved

Energy: 3887 KWH/day

Gas Consumption Reduction

Drying

Number of Responses

2

Number of Design Parameters 

2

Number of Significant Design Parameters

1

Baseline

Gas specific consumption: 3.5 Sm3/Metric Ton

Result Achieved

Gas specific consumption: 2.8 Sm3/Metric Ton

Energy Consumption Reduction

Ultrasonic Cleaning

Number of Responses

1

Number of Design Parameters 

1

Number of Significant Design Parameters

1

Baseline

Energy Consumption: 23.32 KWH/Hour

Result Achieved

Energy Consumption: 18.72 KWH/Hour

Material Cost Reduction

Plasma Powder Welding

Number of Responses

2

Number of Design Parameters 

1

Number of Significant Design Parameters

1

Baseline

Powder Weight: 2.1 grams/component

Result Achieved

Powder Weight: 1.5 grams/component